The progression of the new building is Stockton is really starting to take shape. In the last post the outside of the building was up except for the dock area. Now the dock area is enclosed and they are starting on the interior walls.
The guys at the plant are going to like unloading the trucks with this new addition. They will nice and dry on those rainy days. Lets just hope it rains a little more than what it has for the crops sake!
Now lets move on to the interior walls. First the wall struts have to be set in place.
Then the fabric has to pulled tight and attached to the wall struts.
If they keep going at this rate they will have all the interior walls up in no time!